Trådvurdering:
  • 0 stemmer - 0 gjennomsnitt
  • 1
  • 2
  • 3
  • 4
  • 5
Tildragningsmoment topper 2,5 TD
#1
Hei

Noen som har rekkefølge og tildragningsmoment til toppene 1995 2,5 TD?

mvh

Bie
Sjølberging er alfa og omega.

Svar
#2
<!--quoteo(post=1475466:date=13 Oct 2008, 00:13:name=Bie)-->QUOTE(Bie @ 13 Oct 2008, 00:13) <{POST_SNAPBACK}><!--quotec-->Hei

Noen som har rekkefølge og tildragningsmoment til toppene 1995 2,5 TD?

mvh

Bie<!--QuoteEnd--><!--QuoteEEnd-->

send meg mailadressa di, så skal vi nok få hjulpet deg...
Hadde

98 Pajero 2,8 td, 2" ome og 32"

95 Cherokee 2,5 td 4" Trailmaster og 31"

92 Cherokee 4,0 HO 4" ome+bb og 31"

86 Cherokee 2,6 V6 prosjekt høvdingen

89 Terrano 3,0 V6, 32"
Svar
#3
eller så kan man lage et langt og slitsomt innlegg med hele regla om montering fra du har fått tak i nye topper...

INSTALLATION
(1) Remove the shop towels from the cylinder
bores. Coat the bores with clean engine oil.
(2) Install cylinder head alignment studs VM.1009.
(3) After determining the correct head gasket
thickness, clean the block and head mating surfaces,
place the engine cylinder head gasket over the alignment
studs.
(4) Place the engine cylinder head over the alignment
studs.
CAUTION: New cylinder head bolts should be used.
(5) Tighten the engine cylinder head bolts in
sequence according to the following procedure (Fig.
37) :
a. The threads and underside heads of the bolts
should be lubricated. Use the cylinder head alignment
studs tool number VM-1009. Position the heads
on the block and secure with the ten large center
bolts (14mm) and spacers (clamps), finger tight only.
b. Ensure that the various clamps are installed
correctly and the head gasket remains in it’s proper
position, completely covered. Then, lubricate and
install the eight small bolts (12mm), also finger tight.
(6) Install the intake and exhaust manifolds with
a new gasket, partially tightening the nuts to a maximum
of 5 N·m (44 in. lbs.). This will align the heads.
Refer to Group 11, Exhaust System and Turbocharger
for the proper procedure. Install lift eye and
brake vacuum tube at this time.
(7) Then, tighten the 14mm bolts with special tool
VM.1019 in the following manner:
(8) 1st Phase: Tightening Head Bolts (Fig. 37).
Central bolts (A-L): Tighten all bolts, starting with
bolt H then G-F-E-D-C-B-A-L-I, to 30 N·m. Tighten
all bolts an additional 70°, starting with bolt A and
continuing in alphabetical order. Finally, tighten all
bolts an additional 70°, starting again with bolt A
and continuing in alphabetical order.

Fig. 37 Engine Cylinder Head Bolt Tightening Sequence
Fig. 36 Piston Protrusion Chart
Measured dimension (mm) . . . . . . . . . 0.53 - 0.62
Cyl. head gasket thickness (mm) . . . . . 1.41
Piston clearance (mm). . . . . . . . . . . . . 0.80 - 0.89
Measured dimension (mm) . . . . . . . . . 0.63-0.72
Cyl. head gasket thickness (mm) . . . . . 1.51
Piston clearance (mm). . . . . . . . . . . . . 0.80-0.89
Measured dimension (mm) . . . . . . . . . 0.73-0.82
Cyl. head gasket thickness (mm) . . . . . 1.61
Piston clearance (mm). . . . . . . . . . . . . 0.80-0.89
9 - 28 ENGINE XJ

(9) Tighten the 12mm bolts in the following manner:
(10) Side bolts (M1-M2): Tighten M1 bolts to 30
N·m, then rotate them 85° (65). Tighten M2 bolts to
30 N·m, then rotate them 85° (65).
NOTE: If vehicle is equipped with A/C do not install
A/C lines to compressor and charge A/C till Phase 2
is complete.
(11) 2nd Phase: After 20 minutes of engine operation
at operating temperature, allow engine to cool
down completely. Then retorque the head bolts as follows:
(12) Central bolts A-L: Completely back off bolts
one-by-one and then retighten to 30 N·m plus 130°
(65°). Then proceed in the same way, bolt by bolt,
following alphabetical order, as indicated.
(13) Side bolts M1-M2: Without slackening,
torque bolts M1 then bolts M2 to 90 N·m (66 ft. lbs.).
(14) Torque intake nuts to 32 N·m (24 ft. lbs.) and
exhaust manifolds nuts to 32 N·m (24 ft. lbs.) after
completing the cylinder head torquing procedure.
(15) Install the oil feed lines for the rocker arm
assemblies. Torque oil feed lines to 13 N·m (115 in.
lbs.).
(16) Install the oil feed line retaining bracket at
rear of #4 cylinder head (Fig. 29).
(17) Install the push rods and rocker arm assemblies.
Refer to the rocker arm and pushrod removal
and installation procedure in this group.
(18) Install the cylinder head cover. Torque bolts to
15 N·m (133 in. lbs.).
(19) Connect the crankcase breather hose.
(20) Connect the injector sensor wire and the glow
plug hot lead.
(21) Install the turbocharger oil feed line. Torque
banjo bolts to 27 N·m (20 ft. lbs).
(22) Install the turbocharger oil drain line. Torque
bolts to 11 N·m (97 in. lbs.).
(23) Install the water manifold. Torque bolts to 12
N·m (106 in. lbs.).
(24) Install the generator support bracket.
(25) Raise the vehicle on hoist.
(26) Install the exhaust down pipe to turbocharger,
tighten bolts to 22 N·m (16 ft. lbs.).
(27) Install the exhaust down pipe heat shield.
(28) Install the exhaust heat shield, Tighten bolts
to 11 N·m (8 ft. lbs.).
(29) Install the EGR valve to intake manifold,
tighten bolts to 27 N·m (20 ft. lbs.).
(30) Install the EGR tube to EGR valve, tighten
bolts to 27 N·m (20 ft. lbs.).
(31) Install the lower charge air cooler hose to turbocharger.
(32) Install the air cleaner assembly and hose.
(33) Install the oil breather hose to air cleaner
hose.
(34) Install the upper charge cooler hose to turbocharger.
(35) Connect the recover bottle hose to water manifold.
(36) Install the fuel injectors using special tool
VM.1012. Refer to Group 14, Fuel System for procedures.
(37) Install the fuel injector lines from the pump
to injectors. Torque nuts to 19 N·m (14 ft. lbs.).
(38) Connect the A/C lines to compressor and
install bracket on cylinder head cover, if equipped
with air conditioning.
(39) Install the fuel filter, Tighten bolts to 28 N·m
(250 in. lbs.)
(40) Connect the fuel supply and return lines
(41) Connect the upper radiator hose.
(42) Connect the negative cable battery.
(43) If equipped with A/C, evacuate and charge the
air conditioning system. Refer to Group 24, Heater
and Air Conditioning.
(44) Fill the cooling system. Check for leaks.

WARNING: USE EXTREME CAUTION WHEN THE
ENGINE IS OPERATING. DO NOT STAND IN DIRECT
LINE WITH THE FAN. DO NOT PUT HANDS NEAR
THE PULLEYS, BELTS OR FAN. DO NOT WEAR
LOOSE CLOTHING.

(45) Operate the engine with the radiator cap off.
Inspect for leaks and continue operating the engine
until the thermostat opens. Add coolant, if required.
NOTE: After rebuild or cylinder head gasket
replacement, the cylinder head must be retorqued
within the first 20,000km. If individual fiber type
head gaskets were used.

NOTE: The one piece steel type head gasket does
NOT require, the above mentioned, retorque procedure.

CYLINDER HEAD RE-TORQUE
Within the first 20,000 km (12,000 miles) after
rebuild, retorque the cylinder head bolts as follows:
(Fig. 37) Central bolts A-L: Without slackening the
bolts, following alphabetical order tighten the bolts
through an angle of 15°. Side bolts M1-M2: Without
slackening, tighten M1 then M2 bolts through an
angle of 15°.
Hadde

98 Pajero 2,8 td, 2" ome og 32"

95 Cherokee 2,5 td 4" Trailmaster og 31"

92 Cherokee 4,0 HO 4" ome+bb og 31"

86 Cherokee 2,6 V6 prosjekt høvdingen

89 Terrano 3,0 V6, 32"
Svar


Gå til forum:


Bruker(e) som leser denne tråden: 1 Gjest(er)